Portfolio archivo - Page 4 of 8 - GHESA Ingeniería y Tecnología, S.A.
0
archive,paged,post-type-archive,post-type-archive-portfolio_page,paged-4,post-type-paged-4,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

Archive

The Guelmin Hospital in Morocco includes 250 beds and 32,977 m2 of built-up surface in a plot with a surface area of 91,288 m2.   The completed infrastructure follows a tested concept that includes a compact medical-technical plinth, where the clinical and service activities are performed, and...

This High Resolution Hospital has a built-up surface area of 11,800 m2. It is designed around the following basic premises: • Suitable operability and interrelation between areas. • Separation of circulations and accesses (independent accesses for outpatients, emergencies, personnel and cargo), separation of flows between visitors,...

El hospital está configurado en dos volúmenes separados. El primer volumen es el área médico técnica. El segundo volumen incluye todas las unidades de hospitalización. El eje alrededor del cual se articulan estos volúmenes forma unos pasillos que atraviesan el edificio en dirección norte-sur y permite a...

The expansion of the hospital is a multi-facility development that is intended to complement the existing medical facilities within the Al Farwaniya medical district. The project covers the design and construction of the following buildings, with a total surface area of 430,516 m2: New hospital:...

El Proyecto King Abdullah Airport consiste en el desarrollo y construcción de un Aeropuerto de clasificación CODE 4E en la Provincia de Jazan...

Geothermal Power Plant Nominal Power: 3.5 MW Technology: ORC Turbine: EXERGY Heat Recovery S. Generator: EXERGY Operator: EDA RENOVAVEIS, S.A. Status: Operational...

Waste to Energy Plant for urban waste processing with complete triage, separation, and pre-treatment of residues. Nominal Power: 7,5 MW. Technology: Incineration, Rankine cycle without regeneration. Main Equipment: Steinmüller Babcook Great Boiler Fuel: Solid urban wastes + tires + used oil and slaughterhouse residue. Status: Under development...

Biomass power plant fed with solid waste from paper factory and with bark, with bleeds to provide heat to the process. Nominal Power: 21,4 MWe + 56 MWt process heat. Boiler: BABCOCK / 113 t/h @ 56 bar (a) / 445°C (pre-existent). Fuel: Forestry residue, paper scraps: 100.000...

Hybrid cogeneration plant using Natural Gas and Biomass.   Nominal Power: 30 MW. Technology: Combined Cycle composed of GT + HSRG plus incineration boiler, Rankine cycle without regeneration, controlled turbine bleeds used for supplying heat to the process. Main Equipment: Rolls Royce RB211 Gas Turbine, UMAG Recovery Boiler and MAN Steam...

Biomass to energy plant using oil mill residue. Nominal Power: 12,4 MW. Technology: Incineration, Rankine cycle without regeneration. Boiler: Ahlstrom / 49 t/h @ 87 bar (a) / 482°C. Fuel: Olive cake: 65.000 t/year. Steam Turbine: Siemens. Operator: EMPRESA OLEÍCOLA EL TEJAR, S.C.A. Status: In Operation...