Agricultural waste biomass plant using oil mill residues.
Nominal Power: 16 MW.
Technology: Incineration, Rankine cycle without regeneration.
Boiler: Foster Wheeler / 65,8 t/h @ 62 bar (a) / 452°C.
Fuel: Olive cake: 100.000 t/year.
Steam Turbine: Thermodyn (GE).
Operator: Enel GreenPower
Formerly ECYR (Endesa Cogeneración y Renovables).
Status: In Operation
ENDESA
2003
Ciudad Real, Spain.
EPC/Turnkey project: EPC.