Biomass plant using forestry residue.
Nominal Power: 17 MW.
Technology: Incineration, Rankine cycle without regeneration and additional cogeneration with Gas Engine for biomass kiln.
Boiler: GBS / 59 t/h @ 92 bar (a) / 485 °C.
Fuel: Forestry residue: 160.000 t/year + Natural Gas
Engine: GE Jenbacher 616 de 2 MW.
Kilns: APISA.
Steam Turbine: MAN.
Operator: GESTAMP
Status: In Operation
GESTAMP S.A.
2014
Garray , Soria, Spain.
EPC/Turnkey project:
EPC in JV with GBS.