| Improvements in the WiFi Network Infrastructure and Management of the Internet Access Service for the passengers of the AENA Airports | Madrid, Spain | 2017-2021 | AENA | Construction supervision
Engineering Consultancy
Tender documents |
| New King Abdullah Bin Abdulaziz Airport | Jazan, Saudi Arabia | 2015-(
) | SAFARI | Master Plan review, Tender project review, Construction Design including Terminal Buildings, Auxiliary buildings and Air Field. |
| Algiers Airport New West Terminal | Algiers, Algeria | 2015-2016 | COBRA INSTALACIONES Y SERVICIOS, S.A | Construction Design |
| Valladolid Airport Terminal Expansion | Valladolid, Spain | 2010-2011 | AENA | Schematic Design
Construction Design |
| Barcelona Airport Satellite Building | Barcelona, Spain | 2009-2010 | AENA | Detail Design for the Satellite Terminal building, including waiting and boarding areas, commercial and leisure areas, passengers hotel facility and MEP areas, aircraft taxi and support areas. |
| Aerodrome in Southwest Madrid | Madrid, Spain | 2009-2010 | AEROPUERTOS DE MADRID | Feasibility Study, Master Plan, Special Plan, Environmental Study , Schematic Design |
| Barcelona Airport Expansion. BHS implementation | Barcelona, Spain | 2008-2009 | Ineco | QA/QC
|
| Lanzarote Airport Terminal Building | Lanzarote, Spain | 2008-2009 | AENA | Review and renovation of the building MEP systems. Airport accesses and parking areas rearrangement and landscaping integration works. Full design for the new Commercial Areas.
|
| Barcelona Airport New Terminal Building (Phase I & II) | Barcelona, Spain | 2008-2009 | AENA | QA/QC
|
| Máximo III. Implementation of the Máximo System in several airports of the AENA Network. Phase II | Several locations | 2008 | AENA | QA/QC
Engineering Consultancy |
| Murcia Airport | Murcia, Spain | 2007-2009 | AEROMUR | Engineering design for the New Terminal Area and full design of several buildings including the Tower Control and Annex Builiding, Electrical Building and the Bulk loading Terminal.
MEP Engineering design in the Maneuver Area and Platform.
|
| Technical Assistance for communications and networks systems for Madrid-Barajas Airport | Madrid, Spain | 2006-2014 | AENA | Airport communication systems financial management, planning management, Quality management, Communication management, Project Documentation management |
| Malaga Airport | Málaga, Spain | 2006-2009 | AENA | MEP Engineering Design and Construction Management of the New Terminal Area Expansion.
Technical Consultancy in Architectural Detail Design for the Car Park, Terminal Building, landscaping and access to the airport.
Commercial Areas Construction Design
|
| Airpot Electrical Systems Standarization | Madrid, Spain | 2006-2009 | Ineco
(Aena) | Study for Electrical systems Standarization |
| Central Power Plant (CEN) of the Barcelona Airport New Terminal Area | Barcelona, Spain | 2005-2007 | UTE CEN | Schematic Design
Construction Design
Construction Management
QA/QC |
| Máximo III. Implementation of the Máximo System in several airports of the AENA Network. Phase I | Several locations | 2005-2006 | AENA | QA/QC
Consultancy |
| Castellon Airport | Castellón, Spain | 2005 | FCC-LUBASA | Engineering-Construction Design
QA/QC
|
| New Madrid Metro Central Depot | Madrid, Spain | 2004-2007 | Metro de Madrid (Madrid regional Government) | Full Design and Construction Supervision.
|
| New Control Tower, Annex Building and SEI of the Torrejon Air Base | Madrid, Spain | 2004-2006 | AENA | Schematic Design
Construction Design
Construction Management |
| Barcelona Airport's CENAT and CEZIA Power Plants | Barcelona, Spain | 2004 | AENA | Schematic Design
Construction Design
Construction Management |
| Metro de Sevilla Line 1 (Seville subway) | Sevilla, Spain | 2003-2009 | Metro de Sevilla | Construction Management
QA/QC |
| New Control Tower and Control Building of the Santiago Airport | Santiago de Compostela, Spain | 2003-2007 | AENA | Tender Design, MEP Engineering Construction Design and Construction Management. |
| Improvements in the Electric Systems and Control Towers of the AENA Airports | Several locations | 2003-2004 | AENA | Schematic Design
Construction Design
Construction Management |
| Implementation of the "Máximo" Management System in the Almeria, Menorca, South Tenerife, Vigo and Vitoria Airports | Several locations | 2003-2004 | AENA | QA/QC
Consultancy |
| Cark Park in the existing Terminal of the Gran Canaria Airport | Las Palmas, Spain | 2003 | AENA | Schematic Design
Construction Design |
| Alicante Airport New Terminal Area | Alicante, Spain | 2002-2010 | AENA | New Terminal Area Engineering Design and Construction Management. |
| Improvements in the Electric Systems and Control Towers of the AENA Airports | Several locations | 2002-2003 | INECO | Schematic Design
Construction Design
Engineering Consultancy |
| Expansion of the Malaga Airport Terminal Area | Málaga, Spain | 2001-2005 | AENA | Schematic Design
Construction Design |
| Hierro and Gomera Airports Master Plan | El Hierro y La Gomera, Spain | 2000-2001 | AENA | Concept Design |
| Barcelona Airport Power Supply System | Barcelona, Spain | 2000-2001 | AENA | Concept Design |
| Madrid-Barajas Airport Expansion: Terminal 4 and Satellite Terminal | Madrid, Spain | 1998-2007 | AENA | Technical Consultancy to the Construction Management works at T4 and T4S terminal buildings in Madrid Airport, Spain. The project included the New Commercial Areas at T4 and T4S buildings, the parking areas and runways design and the landscaping design of the external areas. |