archive,tax-portfolio_category,term-renewable-energy,term-93,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

Archive

Geothermal Power Plant Nominal Power: 3.5 MW Technology: ORC Turbine: EXERGY Heat Recovery S. Generator: EXERGY Operator: EDA RENOVAVEIS, S.A. Status: Operational...

Waste to Energy Plant for urban waste processing with complete triage, separation, and pre-treatment of residues. Nominal Power: 7,5 MW. Technology: Incineration, Rankine cycle without regeneration. Main Equipment: Steinmüller Babcook Great Boiler Fuel: Solid urban wastes + tires + used oil and slaughterhouse residue. Status: Under development...

Biomass power plant fed with solid waste from paper factory and with bark, with bleeds to provide heat to the process. Nominal Power: 21,4 MWe + 56 MWt process heat. Boiler: BABCOCK / 113 t/h @ 56 bar (a) / 445°C (pre-existent). Fuel: Forestry residue, paper scraps: 100.000...

Hybrid cogeneration plant using Natural Gas and Biomass.   Nominal Power: 30 MW. Technology: Combined Cycle composed of GT + HSRG plus incineration boiler, Rankine cycle without regeneration, controlled turbine bleeds used for supplying heat to the process. Main Equipment: Rolls Royce RB211 Gas Turbine, UMAG Recovery Boiler and MAN Steam...

Biomass to energy plant using oil mill residue. Nominal Power: 12,4 MW. Technology: Incineration, Rankine cycle without regeneration. Boiler: Ahlstrom / 49 t/h @ 87 bar (a) / 482°C. Fuel: Olive cake: 65.000 t/year. Steam Turbine: Siemens. Operator: EMPRESA OLEÍCOLA EL TEJAR, S.C.A. Status: In Operation...

Biomass to energy plant using oil mill residue. Nominal Power: 16 MW. Technology: Incineration, Rankine cycle without regeneration. Boiler: Foster Wheeler / 65,8 t/h @ 62 bar (a) / 452°C. Fuel: Olive cake: 100.000 t/year. Steam Turbine: Thermodyn (GE). Operator: Enel GreenPower Formerly ECYR (Endesa Cogeneración y Renovables). Status: In Operation...

Agricultural waste biomass plant using oil mill residues. Nominal Power: 16 MW. Technology: Incineration, Rankine cycle without regeneration. Boiler: Foster Wheeler / 65,8 t/h @ 62 bar (a) / 452°C. Fuel: Olive cake: 100.000 t/year. Steam Turbine: Thermodyn (GE). Operator: Enel GreenPower Formerly ECYR (Endesa Cogeneración y Renovables). Status: In Operation...

Biomass plant using agricultural residue (wheat straw) Nominal Power: 18 MW. Technology: Incineration, Rankine cycle without regeneration. Boiler: TERMISA/ vibrating grid / 71 ton/h @ 92 bar / 522°C. Fuel: Wheat Straw provided in bales: 130.000 t/year. Steam Turbine: FRANCO TOSI. Operator: Acciona Energy Status: In Operation...

Biomass plant using agricultural and forestry residue. Nominal Power: 18 MW. Technology: Incineration, Rankine cycle without regeneration. Dual feed system for bales + wood chips. Boiler: TERMISA / vibrating grate/ 71 t/h @ 92 bar / 522°C. Fuel: Baled corn stover + baled wheat straw + forest pruning residue...

Cogeneration in paper factory to produce electricity and to supply heat and steam to process. Nominal Power: 50 MW. Caldera: Andritz / 180 t/h @ 100 bar / 500 °C. Fuel: Forestry residue, paper scraps, packing residue. Total 440.000 t/year. Steam Turbine: Siemens. Operator: Empresa Nacional de Celulosas (ENCE) Status: Operational...