Sub-critical thermal, Sil river cooling.
Nominal Power: 1 x 350 MW.
Boiler: Combustion Engineering T/G.
Fuel: Anthracite, Bituminous Coal.
Steam Turbine Generator: Mitsubishi Heavy Industries.
Operator: Gas Natural Unión Fenosa
Status: Operational
Sevillana de Electricidad.
1984
León, Spain.
Engineering, Consultancy and Design:
Feasibility studies.
Site selection.
EPCM/Project Management