Super-critical thermal plant with river cooling.
Nominal Power: 1 x 550 MW.
Boiler: Balcke Dürr, T/G.
Fuel: Coal, Pet coke, Fuel Oil.
Steam Turbine Generator: Brown Boveri and Cie (BBC).
Operator: Gas Natural Unión Fenosa
Status: Operational
Unión Eléctrica.
1980
Meirama, La Coruña, Spain.
Engineering, Consultancy and Design:
Pre-construction:
Feasibility studies.
Site selection.
Additional services:
Design of desulfurization systems.
Programs for the plant`s availability and performance improvement
Plan to extent the plant’s operational life: engineering & implementation.
O&M Support.
EPCM/Project Management