LADA IV - GHESA Ingeniería y Tecnología, S.A.
2125
portfolio_page-template-default,single,single-portfolio_page,postid-2125,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

LADA IV

About This Project

Sub-critical thermal plant with Nalón river cooling.

 

Nominal Power: 1 x 358 MW.

BoilerBabcock & Wilcox Española.

Fuel: Bituminous coal.

Steam Turbine Generator: Westinghouse.

Operator: IBERDROLA.

Status: Operational

CLIENT:

Cía. Eléctrica de Langreo / Hidrocantábrico.

DATE:

1981

LOCATION:

Soto de Ribera, Asturias, Spain.

SERVICES PROVIDED:

Engineering, Consultancy and Design:
Pre-construction:
Feasibility studies.
Site selection.
Additional services:
Design of desulfurization systems.
Programs for plant´s availability and performance improvement.
Implementation of changes and modification of the central.
O&M Support.
EPCM/Project Management

Category
Coal, Fossil Fuels

Back