COLORTEX - GHESA Ingeniería y Tecnología, S.A.
2016
portfolio_page-template-default,single,single-portfolio_page,postid-2016,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

COLORTEX

About This Project

Cogeneration plant inside a dye and dye-printing factory to produce electricity and to supply steam to the process.

 

Nominal Power: 13MW + heat to the process

Technology: Combined Cycle con GT +HSRG + ST with bleeds.

Gas Turbine: Solar Mars 10 MWe.

Heat Recovery S. Generator: Foster Wheeler, 40 bar, 400°C.

Steam Turbine: KKK 3 MWe;  steam to the process @ 8 bar / 184°C and low pressure steam @ 3 bar / 140°C.

Fuel: Natural Gas

Operator: COLORTEX

Status: Operational

CLIENT:

COLORTEX.

DATE:

1997

LOCATION:

Ontinyent, Valencia, Spain

SERVICES PROVIDED:

EPC/Turnkey project

Category
Fossil Fuels, Industrial Cogeneration (CHP)

Back