SANTURZI - GHESA Ingeniería y Tecnología, S.A.
1895
portfolio_page-template-default,single,single-portfolio_page,postid-1895,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

SANTURZI

About This Project

Combined Cycle Gas Turbine.

 

Nominal Power: 400 MW

Technology: 1+1+1 CCGT Block.

Gas TurbineGE 9001FA.

Heat Recovery S. Generator: Kawasaki.

Steam Turbine: GE.

Fuel: Natural Gas

Operator: IBERDROLA.

Status: Operational

CLIENT:

IBERDROLA.

DATE:

2004

LOCATION:

Santurzi (Santurce), Vizcaya, Spain.

SERVICES PROVIDED:

EPC/Turnkey project

Category
Cycles, Fossil Fuels

Back