Sub-critical thermal plant with river water cooling.
Nominal Power: 1 x 350 MW.
Boiler: Combustion Engineering T/G.
Fuel: Sub-Bituminous Coal.
Steam Turbine Generator: Westinghouse.
Operator: EDP.
Status: Operational
JV Foster Wheeler- Mecánica de la Peña.
1984
Soto de Ribera, Asturias, Spain.
Engineering, Consultancy and Design:
Pre-construction:
Feasibility studies.
Site selection.
Additional services:
Design of desulfurization systems.
Programs for plant´s availability and performance improvement.
Implementation of changes and modification of the central.
O&M Support.
EPCM/Project Management